SCADA system for a component manufacturing plant

Điện Mặt Trời

SCADA system for a component manufacturing plant

  • Location

    Bac Giang

  • Scale / Capacity

    8 production lines

  • Status

    Delivered

Upgrading the control and monitoring system for the entire line for a Japanese FDI client.

Detailed content is being prepared per the content plan.

Upgrading the control and monitoring system for the entire line for a Japanese FDI client.

Detailed content is being prepared per the content plan.

Get a Power-Quality Survey & Switchboard Design Quote

Optimize your plant's energy costs today with a smart power-factor correction system. Hino Systech's expert engineers will run an on-site measurement survey and propose the optimal technical plan — completely free.

Register for technical consulting